Korea Busan New Port New Dredging Ground Marine DCM
Summary
This is a shoreline construction project to create a dredging earth dumping ground (area 2) at Busan Port in Jinhae-gu, Changwon. In accordance with the Busan Port New Port Development Plan, it was constructed by the DCM method to expand the logistics transport capacity of Busan Port through step-by-step reclamation of dredged soil. The basic construction (DCM) was completed about two months earlier than the scheduled construction period among the embankment structures for dredging soil, contributing to the development plan of a new port in Busan Port.
-
Begin 2017.06
Client Busan Regional Office of Oceans and Fisheries
-
Location Changwon, Gyeongsangnam-do, Republic of Korea
Explanation DCM : L = 304,859m
(D=1,200mm*4drivers)

