Singapore DTL STAGE3 C923 Dwall & Pilling
Summary
Singapore subway city line 3rd stage construction is to connect from River Valley to Expo. The site C923, which located 3km far from west of Changi Airport, is a construction for linking with the Upper Changi Station and extension length 900m of Tunnels.
-
Begin 2011.12
Client LTA
-
Location Singapore
Explanation DWall 61,840㎥, SBP(D1000) : 106 bone
Bored-Pile(D600~1600) : 386 bone

