Singapore DTL STAGE3 C923 Dwall & Pilling

Summary

Singapore subway city line 3rd stage construction is to connect from River Valley to Expo. The site C923, which located 3km far from west of Changi Airport, is a construction for linking with the Upper Changi Station and extension length 900m of Tunnels.

  • Begin 2011.12

    Client LTA

  • Location Singapore

    Explanation DWall 61,840㎥, SBP(D1000) : 106 bone
    Bored-Pile(D600~1600) : 386 bone

Youtube
CS CENTER