Korea Seoul Metro Line 9 No.909
Summary
It was the first project for Seoul Metropolitan to apply Shield TBM with 3,634m length (1,817m * 2lines) and 6.75m in diameter. Especially, this project passed through the underground of Capitol and there was only 2m distance to the existing structure. This project was an opportunity to open a new chapter of large section shield TBM for Dong-ah and Korea as well.
-
Begin 2003.09
Client Public Procurement Service
-
Location Seoul, Republic of Korea
Explanation Slurry : Length-3,634(M), Diameter-7,800(mm)
Ground : Complex Stratum