Singapore CRL CR106 / Dwall & Barrette Pile
Summary
Two tunnels (D6300mm/L2.4km/EBP) for MRT opening in the Cross Island line connecting eastern and western Singapore, and a JV (WH-DA) site carrying out civil works on the underground continuous wall and the above-ground elevated road (2km).
-
Begin 2021.09
Client LTA(Land Transport Authority)
-
Location Singapore
Explanation 1. Dwall
1) 800, 1000, 1200 mm thick
2) Extension 2,014 m
3) Construction volume 67,362㎥
2. Barrette Pile
1) Extension 346m
2) Construction volume 13,199㎥