Korea Seoul Metro Line 9 Phase 3 Section No.921/Shield Tunnel

Summary

This project is 2,544m length of Shield Tunnel (complex stratum), 1,272m length of invert concrete placement and 2 tunnel of 17.6m length. The contract period was 57 months. The tunnel passes through the underground of Olympic park as you can see in the below picture.

  • Begin 2011.10

    Client Seoul Metropolitan Government

  • Location Seoul, Republic of Korea

    Explanation EPB, Length-2,544(M), Diameter-7,930(mm)
    Ground : Weathered Rock, Soft & Hard rock

Youtube
CS CENTER