Korea Bujeon-Masan double-track subway system 2 section SHIELD tunnel

Summary

This is the construction of the shield tunnel in the second section of the Bujeon-Masan double-track railway, which was carried out by crossing the Nakdonggang River from Gangseo-gu, Busan to Sasang Station. It was constructed using the Shield Tunnel Method (EPB Type) to extend the Bujeon-Masan double track. The Bujeon-Masan site is 6,283m (complex strata) and 2,497m (clay and shilt layers), with a total length of 8,780m, including 8,780m of invert concrete, five transverse tunnels, and one water collection.

  • Begin 2015.05

    Client Smart Rail Co., Ltd

  • Location Busan, Republic of Korea

    Explanation Total excavation extension: L = 8,780.4 m (2 EPB TBMs)
    - Excavation diameter: D=7,910 mm
    - Nakdong Tunnel #1: L = 6,283.2m (3,141.6m Ⅹ 2 rows)
    - Nakdong Tunnel #2 : L = 2,497.2 m (1,248.6 m Ⅹ 2 rows)
    Invert installation, cavity inspection passage: 8,780.4m
    Five evacuation channels (horizontal shafts) and one collection channel