UAE Abu Dhabi STEP Deep Tunnel Sewer Contract T-01 / Shield Tunnel
Summary
It was the first project in Abu Dhabi to apply Shield TBM. The tunnel is 16km length and 3 EPB type of shield TBM Machines with 5.3m in diameter were assigned. Each TBM Machine excavated about 5km length and we excavated 750m in a month which was the best record among the Korean construction companies at that time.
-
Begin 2012.03
Client ADSSC
-
Location Abu Dhabi
Explanation EPB : Length - 16,032(M),
Diameter - 5,320(mm), 3span, Complex Stratum