Singapore North South Transmission Cable Tunnel NS2 Shield Tunnel
Summary
We assigned 2 Slurry type TBM Machines to this project and excavated 5.3km length of tunnel. The construction section was consisted of hard rock and complex stratum.
-
Begin 2012.12
Client SP Power Grid
-
Location Angmokio Ave1, Singapore
Explanation Slurry : Length-5,380(M), Diameter-6,950(mm)
Ground : Gypsum, Mud stone, Silt stone