Malaysia Cooling Water Intake System for Fast Track 3A Project in Manjung/Shield Tunnel
Summary
This project was the first project that Dong-ah performed in Malaysia and it was EPC (being in charge of Engineering, Procurement and Construction). The purpose of this project was to build water intake line to supply coolant to thermal power plant. The project includes access hole for departure with D-Wall, water intake tunnel with Shield TBM, access hole for arrival with steel caisson.
-
Begin 2014.04
Client TNB (TENAGA NATIONAL BERHAD)
-
Location Perak, Malaysia
Explanation DCM, D-Wall, Steel Caisson, TBM Diameter 6,750(mm)