Singapore DTSS-Kim Chuan Link sewer

Summary

Kim Chuan Link Sewers is a part of deep sewerage system to connect to Upper Paya Lebar Road/ PIE T02 Bedok Tunnel. It is a natural drainage tunnel from existing pumping station to Changi WRP.

  • Begin 2002.05

    Client Singapore PUB

  • Location Singapore

    Explanation Diameter 1,000(mm), Length 990m

Youtube
CS CENTER