Korea Geoncheon Pochon electric power cabel tunnel

Summary

The purpose of this project is to solve the overload around Geoncheon electric power station and to supply electricity to Geoncheon industrial complex in the future. We excavated 327.62m length Semi shield tunnel for outgoing distribution line from newly-built Geoncheon electric power station.

  • Begin 2011.01

    Client KEPCO

  • Location Gyeongju, Gyeongsangbuk-do, Republic of Korea

    Explanation Width D 2,000mm, Length 327.6m, rock layer, 1 span