Korea Geoncheon Pochon electric power cabel tunnel
Summary
The purpose of this project is to solve the overload around Geoncheon electric power station and to supply electricity to Geoncheon industrial complex in the future. We excavated 327.62m length Semi shield tunnel for outgoing distribution line from newly-built Geoncheon electric power station.
-
Begin 2011.01
Client KEPCO
-
Location Gyeongju, Gyeongsangbuk-do, Republic of Korea
Explanation Width D 2,000mm, Length 327.6m, rock layer, 1 span