Korea Sosa-Wonsi Double Track Railway 4-3(Tunnel/Open)

Summary

This project is located in Wonsi-dong, Ansan-si, Gyeonggi-do. We applied NATM for 543m length and Open Cut Method for 500m length.

  • Begin 2012.01

    Client E-Rail

  • Location Ansan, Gyeonggi-do, Republic of Korea

    Explanation Main Tunnel(500m)
    Main Excavation(543m)

Youtube
CS CENTER