Korea Seoul Subway Line No.9 Section 922 Construction/Earth Work and Structure Work(Phase 3)

Summary

This project is located in Dunchun-dong, Gangdong-gu, Seoul. With Oryun Station as the center, total 1,470m length with one platform and four collecting wells and/or ventilating openings.

  • Begin 2012.01

    Client Seoul Metropolitan Government

  • Location Seoul, Republic of Korea

    Explanation Main Tunnel : 962m (Top&Bottom), Length 167.8M

Youtube
CS CENTER