Korea Myeongdong Marina Seawall Construction

Summary

It is a breakwater construction work to secure the Jeong-temperature water area necessary for the operation of Myeong-dong Marina in front of Jinhae-gu, Changwon-si, Gyeongsangnam-do. Among the breakwater construction (480M), 26,163m of ground improvement construction and 8,863m of four-axis column were constructed using the marine DCM Φ1200mm, four-axis construction method.

  • Begin 2014.08

    Client Changwon, Gyeongsangnam-do

  • Location Changwon, Gyeongsangnam-do, Republic of Korea

    Explanation Length : 26,163m (D=1,200mm*4drivers)

Youtube
CS CENTER