Summary
Major Projects
-
Korea Construction of the Gimpo-Paju Expressway 2 -
Korea Installation of the Nakdonggang River Crossing Water Pipeline of Vertical District and Shield TBM Tunnel Construction -
Korea Construction of Byeolnae Line (Extension of Line 8) Section 2 -
Korea Goseong hai thermal power plant / Intake Shield TBM -
Singapore PUB D1200 Pipeline -
Korea Ulsan Stockpile Underground Construction-Tunnel Excavation Work

