		Major Performance
		
												- 
				 
 
					Singapore Thomson Line T213
						- 
							Period
							2014.04 ~ 2015.07
						
- 
							Client
							LTA
						
- 
							Location
							Singapore
						
- 
							Explanation
							D-Wall Method
						
 
 
- 
				 
 
					Korea Haeundae LCT Construction
						- 
							Period
							2013.11 ~ 2015.04
						
- 
							Client
							LCT
						
- 
							Location
							Busan, Republic of Korea
						
- 
							Explanation
							Earthworks, underground continuous walls, on-site percussion piles, PRD, RJP, E/A, facilities, measurement management
						
 
 
- 
				 
 
					Singapore Cable Tunnel NS2 Dwall
						- 
							Period
							2013.11 ~ 2018.05
						
- 
							Client
							SP Power Grid
						
- 
							Location
							Sembawang shaft, Singapore
						
- 
							Explanation
							Diapharagm Wall Method, Excavating:D=6,990mm
						
 
 
- 
				 
 
					Korea Mt. Cheonma Tunnel Construction/Tunnel Work
						- 
							Period
							2013.10 ~ 2019.01
						
- 
							Client
							Mt. Cheonma Tunnel Corporation
						
- 
							Location
							Busan, Republic of Korea
						
- 
							Explanation
							NATM, 2 Lane 2Way tunnel Length 1.5km (Two-lane Tunnel in both direction)
						
 
 
- 
				 
 
					Korea T2 Section Soil Excavation & Piling Constrution(Including Underground Structure of Station
						- 
							Period
							2013.10 ~ 2015.12
						
- 
							Client
							Incheon International Airport Corporation
						
- 
							Location
							Incheon, Republic of Korea
						
- 
							Explanation
							Diameter Φ2500 138 pieces,
 Diameter Φ2000  63 pieces
 
 
- 
				 
 
					Singapore DTL STAGE2 C918A/Bored-Tunnel
						- 
							Period
							2013.09 ~ 2015.04
						
- 
							Client
							LTA
						
- 
							Location
							Singapore
						
- 
							Explanation
							Shield Tunnel 2
 ( S604 : 814m, S605 : 863m )